We provide clients off-Grid, on-site, Behind-the-Meter Power Plants coupled with large-scale Data Center construction services.

.

Step #1

Our team of experienced Energy, Infrastructure, Telecom/Fiber, IT/Cyber, CRE, Environmental and Finance professionals evaluate the viability for clients of potential power solutions for Utility-scale, off-Grid, on-site Power Plants that provide electrical energy at competitive rates for High-Performance Computing (HPC) large-scale Data Centers (BTC/5G/AI/Cloud Compute/Big Data Processing) featuring 2025-spec Direct-to-Chip (DTC) Direct Liquid Cooling (DLC).

.

Step #2

Our assessments typically include analysis of potential Hydroelectric, Nuclear/SMR, Fossil Fuels, Wind and Solar configurations based on geographic-specific locations and, accordingly, take into account all relevant regulatory, jurisdictional and environmental considerations.

.

Step #3

Upon completion of the analysis and in tandem with our team's resulting consultative recommendations, we provide a specific plan to initiate a large-scale Data Center project with its own on-site Power Plant and can execute that plan - delivering a fully constructed Data Center featuring private, neutral, low-latency Fiber & an off-Grid, on-site Power Plant with N+1 redundancy.

.

Step #4

Clients that engage us for building/facility construction and power/fiber procurement services benefit from both an expedited time schedule - compared to on-Grid alternatives as well as off-Grid projects helmed by other less nimble consultancies - and highest degree of quality assurance thanks to the decades of experience as well as breadth and depth of our team and that of our accomplished service providers.

.

Own your own 150,000 square feet, 150 MW Data Center with its own off-Grid, on-site, Natural Gas Generator Power Plant located in the USA.

.

Why wait 5-8 years for on-Grid interconnectivity (presuming permitting is in place and other unforeseen delays are not encountered) when an off-Grid, on-site Natural Gas Power Generator Plant (with rates that are less than Grid interconnections in addition to enhanced privacy/security) can be provided by our team - move-in ready/turnkey - within 6-months of the proper permits being secured ?

.

If you are an Enterprise-caliber client, our team can deliver to you 150,000 square feet large-scale Data Center building/facility featuring private, neutral, low-latency Fiber and an off-Grid, on-site, Behind-the-Meter 150 MW Natural Gas-fired Power Plant (as low as 1.04 PUE) with N+1 redundancy - within 6-months of permit approvals (expedited permits are also available based on geographic location selected by the client).

.

We conduct all of the required due diligence including site assessment(s), architectural design, engineering, securing the environmental and infrastructure permits, ensuring insurability viability, Natural Gas availability, connectivity and generators as well as private, neutral, low-latency Fiber-procurement.

.

Our team implements robust and trackable quality-control processes - before, during and after the construction - that result in providing our clients with a move-in ready/turnkey Data Center building/facility and Natural Gas Power Generator Plant that is delivered to spec.

.

In addition, upon completion of the construction of the Data Center building/facility and Natural Gas-fired Power Plant, our team (at the discretion of the client) can then coordinate the IT/Data Center General Contractor when it comes to the Data Center infrastructure, networking, hardware (servers/storage), cybersecurity, site security as well as coordinate service providers for on-going, full life-cycle management to reliably maintain Tier III standards.